Industry Alerts

A pallet of pharmaceuticals arrives at a UK warehouse on a Tuesday. The outer packaging looks intact. The driver hands over the CMR note, the receiver signs it clean, and the truck pulls away. Eight days later, a picker in the warehouse breaks open the outer wrap and discovers a shattered inner carton, roughly £40,000 of stock ruined by crush damage that must have happened somewhere in transit. The claim seems obvious. It isn’t.

Under the CMR Convention the international treaty governing international carriage of goods by road between contracting states concealed damage should be notified to the carrier in writing within seven days of delivery, excluding Sundays and public holidays. If notice is not given within that period, the condition recorded at delivery becomes prima facie evidence of the condition in which the goods were received. The claim is not automatically extinguished but proving that the damage occurred during carriage can become considerably more difficult.

Road freight is the workhorse of European trade — and CMR is the rulebook nobody reads until the moment they need it most. If you ship, receive or handle goods that cross a border by truck, this is the Insight that could save you a claim.

CMR in 60 seconds — the numbers every shipper should know

  • What it is: the international convention governing qualifying cross-border road freight between contracting states. In force since 1956, it applies across more than 50 contracting states throughout Europe and beyond.
  • UK status: incorporated into English law by the Carriage of Goods by Road Act 1965 — still fully in force post-Brexit.
  • Liability cap: 8.33 SDR per kilogram of gross weight (roughly €10/kg or ~£8.50/kg at mid-2026 rates).
  • Visible damage: must be noted on the CMR note at the moment of delivery.
  • Concealed damage: written notice within 7 days of delivery (excluding Sundays and public holidays).
  • Delay: written protest within 21 days of delivery.
  • Time bar for legal action: 1 year (3 years for wilful misconduct).

WHY CMR QUIETLY RUNS YOUR BUSINESS
If your goods travel by road from Rotterdam to Rugby, from Calais to Coventry, from Warsaw to Wakefield — CMR governs the contract. It does so automatically, whether you’ve read it or not, and it overrides most of what the carrier’s standard terms attempt to say to the contrary. The convention was designed to bring order to an industry that, before 1956, sat under a patchwork of national laws so inconsistent that identical shipments could produce wildly different outcomes depending on where the damage occurred.

CMR replaced that patchwork with a single set of rules — uniform liability, uniform documentation (the CMR consignment note), uniform deadlines and uniform defences. That predictability is a genuine commercial gift. But it comes with a catch: the rules apply on the carrier’s terms, and the deadlines are unforgiving.

THE FOUR DEADLINES THAT DECIDE THE OUTCOME
Nearly every failed CMR claim we see fails not on the merits but on the clock. The convention imposes four distinct time limits, and each one traps a different kind of claim:

  • Visible damage — at delivery. Any damage that a reasonably attentive receiver could see on unloading must be noted on the CMR note itself before the driver leaves. A clean signature on the CMR note is powerful evidence that the goods arrived in apparent good order.
  • Concealed damage — 7 days. Damage that is not apparent at the time of delivery should be notified to the carrier in writing within seven days of delivery, excluding Sundays and public holidays. If written reservations are not made within that period, the condition recorded at delivery becomes prima facie evidence of the condition in which the goods were received. The claim is not automatically extinguished, but the claimant may face a significantly greater evidential burden.
  • Delay — 21 days. A claim for economic loss caused by late delivery must be raised in writing within 21 days of the day the goods were placed at the consignee’s disposal. And CMR compensation for delay is capped at the freight charge — not the value of the goods.
  • Legal action — 1 year. Any court or arbitration claim must be brought within one year of delivery (three years if wilful misconduct is proven). The year runs whether you’re still negotiating with the carrier or not.

The 8.33 SDR CAP — AND WHY IT HURTS MORE THAN SHIPPERS EXPECT
When compensation is due, CMR caps the carrier’s liability at 8.33 Special Drawing Rights per kilogram of the gross weight lost or damaged. In mid-2026 money, that’s roughly €10 per kilogram, or about £8.50/kg. Compared to the Hague-Visby sea cap (2 SDR/kg), CMR is generous. Compared to the actual value of modern road cargo — electronics, pharmaceuticals, luxury goods — it can still be a fraction of the loss.

Consider a real-world example, using indicative 2026 SDR values:

  • A pallet of high-value electronics: 500 kg gross weight, invoice value £120,000. Maximum CMR recovery: ~£4,250. The gap: over £115,000.
  • A truckload of pharmaceuticals: 18,000 kg gross weight, invoice value £500,000. Maximum CMR recovery: ~£153,000. Still a meaningful shortfall on many pharma consignments.
  • A load of construction steel: 22,000 kg, invoice value £40,000. CMR recovery cap: ~£187,000 — comfortably above the loss. Cargo of low value per kilo suffers least from the cap

The pattern is clear: the higher your cargo’s value-per-kilo, the more painful the cap. And there are only two ways to break it — either declare a higher value on the CMR note before carriage (and pay a surcharge), or prove wilful misconduct by the carrier, which is a high bar.

WHERE CMR CLAIMS MOST OFTEN GO WRONG
From the claims-handler’s desk, the same avoidable mistakes recur again and again:

  • The clean signature. A driver in a hurry, a receiver who signs before inspecting, a consignment note stamped “received in good order” when the goods have never actually been looked at. This single act reverses the burden of proof against the cargo interest.
  • The missing CMR note. Incomplete or absent consignment notes weaken every claim. Missing weight, missing signature, wrong address — each opens a defence.
  • The subcontracting fog. A load booked with Carrier A, moved by Sub-carrier B, damaged while stored briefly by Warehouse C. Untangling who was in possession, when, and under which contract is often the biggest single piece of work.
  • Mixed-mode confusion. Almost every UK-to-continent CMR shipment involves a ferry or Channel crossing. Loss during that sea leg may be governed by Hague-Visby rather than CMR — a completely different cap and time bar. Which regime applies is a technical question with major financial consequences.
  • The time bar that never expires. Cargo interests often assume the one-year clock pauses while they negotiate with the carrier. It doesn’t. Correspondence is not a substitute for a formal claim.

WHAT UK SHIPPERS SHOULD BE DOING NOW

  • Train your receiving teams. The single most valuable CMR control is a receiver who inspects properly before signing — and annotates the CMR note when anything looks wrong. This is a training issue, not a legal one.
  • Diarise the 7-day rule. Any suspected concealed damage should trigger written reservations to the carrier within seven days of delivery, excluding Sundays and public holidays, even if the full extent of the loss is not yet known.
  • Insure to real value. The CMR cap protects the carrier, not you. A marine cargo policy with road-transit cover pays your true value regardless of the 8.33 SDR limit.
  • Declare higher value for high-value cargo. For genuinely high-value-per-kilo consignments, ask about declaring value on the CMR note. The surcharge is usually modest against the exposure it closes.
  • Preserve the paperwork. CMR note, booking confirmation, delivery photos, driver ID — every document you’ll wish you had at month twelve should be gathered in the first week.
  • Get advice early. A claim framed correctly in week one is a different claim from one raised in month eleven. Early specialist input consistently produces better outcomes.

COLLYERS ROLE
Road freight liability is one of the three core pillars of Collyers’ work — alongside marine cargo and air freight. CMR claims sit at the intersection of contract, convention and hard operational reality, and their outcomes turn on facts that were captured (or missed) at the moment of delivery, long before a claim was ever contemplated. That is exactly the territory we understand: investigating the loss, unpicking the contractual chain, protecting the time bar, and building the strongest recoverable claim within — or against — the CMR cap.

Cargo damaged, delayed or lost on a road shipment?
The first seven days matter. Preserve the CMR note, notify the carrier in writing, and get specialist claims advice fast.
Collyers handles marine cargo, air freight and road freight liability claims from first notification through to recovery. Talk to our claims team or get in touch directly.

Collyers Industry Alerts – providing practical insights into developments affecting global cargo claims and freight liability risk.

Industry Alerts

Three Letters

Who bears a cargo loss under FOB, FCA, CIF or DAP? Understand Incoterms® 2020 risk transfer, insurance and cargo claims, plus the Incoterms® 2030 revision now under way.

Read more
Industry Alerts

Three Degrees From Disaster

Reefer and cold chain cargo failures account for around 30% of container-vessel cargo claims. Why pharma and food losses are uniquely complex, the five ways cold chains break, and how to build a claim that survives. From Collyers.

Read more
Industry Alerts

The Rust Beneath the Vessel

Global shipping losses are at a record low — but vessels aged 20+ years now cause more than half of all incidents. Why an ageing fleet is 2026’s quietest cargo claims risk, and what shippers should do. From Collyers.

Read more